Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

  • 1. Safety and Compliance Department, Cernavoda NPP Unit 1, str. Medgidiei 1, C.P.42, RO-8625 Cernavoda (Romania)

Description

The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

Part of:
COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1

Additional details

Additional titles

Original title (English)
COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1

Publishing Information

Publisher
Nuclearelectrica National Society and CNE-PROD Cernavoda
Imprint Place
Constanta (Romania)
Imprint Title
COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1
Imprint Pagination
379 p.
Journal Page Range
p. 61-102

Conference

Title
5. technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors'
Original Conference Title
COG/IAEA: 5. technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1
Acronym
COG/IAEA
Dates
7-10 Sep 1998
Place
Mangalia (Romania)

Optional Information

Notes
1 tab., 20 figs. Imprint:COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1