Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)
Creators
- 1. Safety and Compliance Department, Cernavoda NPP Unit 1, str. Medgidiei 1, C.P.42, RO-8625 Cernavoda (Romania)
Description
The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)
Additional details
Additional titles
- Original title (English)
- COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1
Publishing Information
- Publisher
- Nuclearelectrica National Society and CNE-PROD Cernavoda
- Imprint Place
- Constanta (Romania)
- Imprint Title
- COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1
- Imprint Pagination
- 379 p.
- Journal Page Range
- p. 61-102
Conference
- Title
- 5. technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors'
- Original Conference Title
- COG/IAEA: 5. technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1
- Acronym
- COG/IAEA
- Dates
- 7-10 Sep 1998
- Place
- Mangalia (Romania)
INIS
- Country of Publication
- Romania
- Country of Input or Organization
- Romania
- INIS RN
- 32042263
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- CERNAVODA-1 REACTOR; FAILURE MODE ANALYSIS; PERFORMANCE; REACTOR MONITORING SYSTEMS; REACTOR OPERATION; RISK ASSESSMENT
- Descriptors DEC
- CANDU TYPE REACTORS; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; NATURAL URANIUM REACTORS; OPERATION; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; SYSTEM FAILURE ANALYSIS; SYSTEMS ANALYSIS; THERMAL REACTORS
Optional Information
- Notes
- 1 tab., 20 figs. Imprint:COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. Vol. 1