Real-time risk assessment of operational events
- 1. Nuclear Safety Div., Johannesburg (South Africa). Technol. Group
Description
Probabilistic risk assessment (PRA) has always been fundamental to the licensing process of Koeberg nuclear power station. Furthermore, over the past 8 years PRA has assisted in many areas of operation. One of these areas is the real-time assessment of abnormal operating events. Over the years, considerable experience has been gained in using PRA to improve plant safety and performance. This paper presents some of the insights obtained in using PRA in such a dynamic role and demonstrates that, by developing and using the plant-specific 'living' PRA, considerable safety and financial gains can be obtained. These insights specifically concern the prerequisites before optimal use of a plant-specific 'living' PRA can be made. Finally, examples are presented of occurrences when PRA was used to improve plant safety and performance. These examples serve to demonstrate the advantages that can be obtained if sufficient resources are placed at the disposal of the PRA team. (orig.)
Additional details
Publishing Information
- Journal Title
- Nuclear Engineering and Design
- Journal Volume
- 160
- Journal Issue
- 1-2
- Journal Page Range
- p. 203-211.
- ISSN
- 0029-5493
- CODEN
- NEDEAU
INIS
- Country of Publication
- Netherlands
- Country of Input or Organization
- Netherlands
- INIS RN
- 27041755
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- COMPUTER CODES; KOEBERG-1 REACTOR; KOEBERG-2 REACTOR; LEAKS; PROBABILISTIC ESTIMATION; PUMPS; PWR TYPE REACTORS; QUALITY ASSURANCE; QUALITY CONTROL; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SAFETY; RELIABILITY; SAFETY ANALYSIS; STEAM GENERATORS; VALVES
- Descriptors DEC
- BOILERS; CONTROL; CONTROL EQUIPMENT; ENRICHED URANIUM REACTORS; EQUIPMENT; FLOW REGULATORS; MAINTENANCE; OPERATION; POWER REACTORS; REACTORS; SAFETY; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS