Tank waste remediation system retrieval and disposal mission key enabling assumptions

Description

An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed. An analysis of the programmatic, management and technical activities necessary to declare Readiness to Proceed with execution of the mission demonstrates that the system, people, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2002. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed, transfer piping routes were mapped on it, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define work scope in greater detail, cost estimates and associated year by year financial analyses were completed. Personnel training, qualifications, management systems and procedures were reviewed and shown to be in place and ready to support the Phase 1B mission. Key assumptions and risks that could negatively impact mission success were evaluated and appropriate mitigative actions plans were planned and scheduled

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050453; NTIS; INIS; US GOVT. PRINTING OFFICE DEP.

Files

30057709.pdf

Files (727.6 kB)

Name Size Download all
md5:a897782e8743aaae89deed4a41e4d405
727.6 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
35 p.
Report number
HNF--1945-Rev.1