Inservice measurements on pipe systems and components in nuclear power plants

  • 1. Technischer Ueberwachungs-Verein Rheinland e.V., Inst. fuer Materialpruefung, Koeln (Germany)

Description

The in-service monitoring system consists off our phases. In phase 1, pipings are long-term monitored by mechanical measuring methods for maximal movements and long-term changes within the frame of off-line in-service monitoring. Special processes are analyzed within the frame of phase 2 by means of special measurements. Phase 3 allows an on-line monitoring of electrical signals with the help of permanent monitoring systems, with data print-out when predetermined limit values are reached, and including the possibility to display the measured values on site, and to evaluate them. In phase 4, the results of the permanent monitoring are used for fatigue calculations with simple or, if appropriate complicated methods. (orig.)

Abstract (German)

Das Betriebsueberwachungssystem besteht aus vier Phasen. In der Phase 1 werden im Rahmen der Off-line-Betriebsueberwachung Rohrleitungen mit mechanischen Messverfahren langfristig auf Maximal-Bewegungen und Langzeitveraenderungen ueberwacht. Spezielle Vorgaenge werden im Rahmen der Phase 2 mit Sondermessungen gezielt untersucht. Phase 3 erlaubt mit Dauerueberwachungsanlagen eine On-line-Ueberwachung elektrischer Signale mit Kontrollausdrucken bei Erreichen vorgegebener Grenzwerte und der Moeglichkeit, die Messwerte aktuell vor Ort darzustellen und auszuwerten. In der Phase 4 werden dann die Ergebnisse der Dauerueberwachung einer Ermuedungsberechnung mit einfach oder ggf. aufwendigen Verfahren unterzogen. (orig.)

Additional details

Additional titles

Original title (German)
Betriebsueberwachung von Rohrleitungen und Komponenten in Kernkraftwerken

Publishing Information

Imprint Title
Safety and reliability of plant technology with special emphasis on nuclear technology. Papers. Vol. 1
Imprint Pagination
600 p.
Journal Page Range
p. 18.1-18.12.

Conference

Title
Safety and reliability of plant technology with special emphasis on nuclear technology - ageing mechanisms and potential for energy absorption in piping systems.
Original Conference Title
17. MPA-Seminar: Sicherheit und Verfuegbarkeit in der Anlagentechnik mit dem Schwerpunkt Kerntechnik - Rissausloesende Faktoren und Potential fuer Energieaufnahme in Rohrleitungssystemen
Acronym
17. MPA-seminar
Dates
10-11 Oct 1991.
Place
Stuttgart (Germany).

INIS

Country of Publication
Germany
Country of Input or Organization
Germany
INIS RN
26011220
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
FATIGUE; MECHANICAL VIBRATIONS; PIPES; REACTOR COMPONENTS; REACTOR MONITORING SYSTEMS; REACTOR SAFETY; RISK ASSESSMENT
Descriptors DEC
MECHANICAL PROPERTIES; SAFETY

Optional Information

Notes
Imprint:Sicherheit und Verfuegbarkeit in der Anlagentechnik mit dem Schwerpunkt Kerntechnik. Vortraege. Bd. 1.