Published 1987
| Version v1
Report
Open
Recalculation of a few bare plutonium critical arrays
Description
This report presents the results of computations performed to investigate the discrepancy between previous calculation and critical experiments involving bare cubic arrays of Pu metal cylinders. It is shown that including all the support structure in the modeling is sufficient to account for earlier discrepancies. The presence of concrete walls, simulating the experimental cell, produced no statistically significant change in the array k/sub eff/
Availability note (English)
Available from NTIS, PC A02/MF A01; 1 as DE87012527.Files
19018693.pdf
Files
(222.7 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:79101613207ebf401de702c9203bb1ad
|
222.7 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 9 p.
- Report number
- CONF-8704113--2
Conference
- Title
- Contractors nuclear criticality safety meeting.
- Dates
- 27 Apr 1987.
- Place
- Las Vegas, NV (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 19018693
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ALGORITHMS; CALIBRATION; CONCRETES; CRITICALITY; CYLINDERS; FUEL ASSEMBLIES; PLUTONIUM
- Descriptors DEC
- ACTINIDES; BUILDING MATERIALS; ELEMENTS; MATERIALS; METALS; TRANSURANIUM ELEMENTS
Optional Information
- Notes
- Portions of this document are illegible in microfiche products.