Published June 1989 | Version v1
Report Open

Spent fuel assembly hardware: Characterization and 10 CFR 61 classification for waste disposal

Description

Consolidation of spent fuel is under active consideration as the US Department of Energy plans to dispose of spent fuel as required by the Nuclear Waste Policy Act of 1982. During consolidation, the fuel pins are removed from an intact fuel assembly and repackaged into a more compact configuration. After repackaging, approximately 30 kg of residual spent fuel assembly hardware per assembly that is also radioactive and required disposal. Understanding the nature of this secondary waste stream is critical to designing a system that will properly handle, package, store, and dispose of the waste. This report presents a methodology for estimating the radionuclide inventory in irradiated spent fuel hardware. Ratios are developed that allow the use of ORIGEN2 computer code calculations to be applied to regions that are outside the fueled region. The ratios are based on the analysis of samples of irradiated hardware from spent fuel assemblies. The results of this research are presented in three volumes. In Volume 1, the development of scaling factors that can be used with ORIGEN2 calculations to estimate activation of spent fuel assembly hardware is documented. The results from laboratory analysis of irradiated spent-fuel hardware samples are also presented in Volume 1. In Volume 2 and 3, the calculated flux profiles of spent nuclear fuel assemblies are presented for pressurized water reactors and boiling water reactors, respectively. The results presented in Volumes 2 and 3 were used to develop the scaling factors documented in Volume 1

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A08/MF A01 - OSTI as DE89015189; US Govt. Printing Office Dep.

Files

21011387.pdf

Files (4.0 MB)

Name Size Download all
md5:2b1596548b787ee392936059b945967d
4.0 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Volume 3, Calculated activity profiles of spent nuclear fuel assembly hardware for boiling water reactors

Publishing Information

Imprint Pagination
164 p.
Report number
PNL--6906-Vol.3

Optional Information

Contract/Grant/Project number
Contract AC06-76RL01830