Published 2018 | Version v1
Miscellaneous Restricted

The decommissioning of a PWR experimental facility: from shutdown to removal from site - 000063

  • 1. SCK-CEN, Belgian Nuclear Research Centre, Boeretang 200, B-2400 Mol (Belgium)

Description

BR2 is one of the world's principal high-flux materials testing reactors and CALLISTO was one of BR2 principal irradiation experiments since the early 1990's, used for PWR fuel and material studies. The dismantling of CALLISTO began in 2015. The CALLISTO end of life decommissioning strategy aimed for waste, cost and dose uptake minimization and included: -) the unloading and removal of the in-pile sections, -) a closed-loop full system chemical decontamination for dose reduction, -) the complete dismantling of the loop, -) the further sorting and segmentation in a dedicated workshop, -) a hard chemical batch wise decontamination for unconditional release. The paper will describe this project in detail with a focus on decommissioning activities, dose uptake and material management.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
INIS-FR--19-0586

Conference

Title
International conference on dismantling challenges: industrial reality, prospects and feedback experience
Acronym
DEM 2018
Dates
22-24 Oct 2018
Place
Avignon (France)

Optional Information

Notes
5 refs.; Available from the INIS Liaison Officer for France, see the INIS website for current contact and E-mail addresses