Published 2018 | Version v1
Miscellaneous

The Status of the HTR-PM Project in China

Creators

  • 1. Chinergy Co., Ltd., Beijing (China)

Description

The HTR-PM project is one of sixteen Chinese National S&T Major Projects supported by central government. The project covers the design of HTR-PM demonstration plant, the construction and operation of the plant as well as full scale engineering test of some main components. The HTR-PM consists of two pebble-bed reactor modules coupled with a 210 MWe steam turbine. Main design features of the HTR-PM were described in this presentation. The first concrete of HTR-PM was poured on December 9, 2012, in Rongcheng, Shandong Province. Detailed progress of the HTR-PM was reported. The HTR-PM is scheduled to be connected to grid around the end of 2019. The roles of HTR-PM in China are: to be supplement to LWR for small and medium size power generation, to replace the fossil power plant, and to be a major technology in nuclear process heat. Therefore the design of the HTR-PM600 and its site selection is in progress. (author).

Part of:
Book of Abstracts of 12th International Conference of the Croatian Nuclear Society: Nuclear Option for CO2 Free Energy Generation

Additional details

Publishing Information

Imprint Place
Zagreb (Croatia)
ISBN
978-953-48100-1-9
Imprint Title
Book of Abstracts of 12th International Conference of the Croatian Nuclear Society: Nuclear Option for CO2 Free Energy Generation
Imprint Pagination
147 p.
Journal Page Range
p. 73
Report number
INIS-HR--18002

Conference

Title
Nuclear Option for CO2 Free Energy Generation
Acronym
12. International Conference of the Croatian Nuclear Society
Dates
3-6 Jun 2018
Place
Zadar (Croatia)