Cost for the radioactive wastes from nuclear power
Description
The future cost for handling, storing and disposing of radioactive wastes from the Swedish nuclear power plants are calculated in this report. The following plants and systems are already operating: - Transportsystem for radioactive wastes. - A control spent fuel intermediate storage plant. - A repository for low and medium level wastes. These are planned: - A treatment plant for used fuels. A repository for high-level wastes and repository for decommissioning wastes. The costs include Rand D and decommissioning. Total future costs from 1990 are estimated to be 43 billion SEK (6,5 billion dollars), during 60 years. Up to 1990 7,4 billion SEK (1,1 billion dollars) have been spent. (L.E.)
Availability note (English)
MF available from INIS under the Report Number.Files
21015433.pdf
Files
(708.6 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:850b9c5bf2eddfa1a70613ea263e871f
|
708.6 kB | Preview Download |
Additional details
Additional titles
- Original title (Swedish)
- Kostnader foer kaernkraftens radioaktiva restprodukter
Publishing Information
- Imprint Pagination
- 32 p.
- Report number
- SKB-PLAN--89
INIS
- Country of Publication
- Sweden
- Country of Input or Organization
- Sweden
- INIS RN
- 21015433
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- COST; DECOMMISSIONING; NUCLEAR POWER; RADIOACTIVE WASTES; SWEDEN; UNDERGROUND DISPOSAL; WASTE DISPOSAL
- Descriptors DEC
- DEVELOPED COUNTRIES; EUROPE; MANAGEMENT; MATERIALS; POWER; RADIOACTIVE MATERIALS; SCANDINAVIA; WASTE MANAGEMENT; WASTES