Application of CERREX software for KRR-1 Decommissioning Cost Estimation

  • 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

Description

Main objectives of cost estimation is to indicate the costs required to complete the decommissioning project and to optimize the dismantling sequence and timing and then minimize the decommissioning total costs. There are three types of cost estimate; (i) Order of magnitude estimate, (ii) Budgetary estimate, (iii) Definitive estimate. Second of the theses types is applied to cost calculation in this paper. This was also applied to cost estimate part of preliminary decommissioning plan for Kijang construction approval. In this paper, the methodology and procedure for decommissioning costing using CERREX software were presented and cost estimation was performed and compared with actual decommissioning cost for KRR- 1(Korea Reactor Research, Unit 1). Cost estimation for KRR-1 was carried out applying to CERREX software. Table 1 shows the result values of the calculation. The currency was calculated as USD. Calculated cost is within the limit of 'Budgetary estimate' and the values is approximately $7,800,000. Labor costs are calculated based on manpower components per involved professions and hour rates per typical professions

Part of:
Proceedings of the KNS 2016 Autumn Meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS 2016 Autumn Meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[3 p.]

Conference

Title
2016 Autumn Meeting of the KNS
Dates
26-28 Oct 2016
Place
Kyungju (Korea, Republic of)

Optional Information

Notes
6 refs, 2 figs, 1 tab