Feasibility study for the retrofitting a small hydroelectric power station at the mill of Noiraigue, Switzerland

  • 1. MHyLab, Montcherand (Switzerland)
  • 2. RWB SA, Cernier (Switzerland)

Description

For the time being, the old mill on the left bank of the river Noiraigue, Switzerland is equipped with a small turbine of only a few kW. The present study investigates the technical and economical possibilities for maximizing the electric power production at the site. Two variants were studied: variant A retains the existing construction at the site and comprises a single turbine with a maximum electric power output of 70 kW. The annual energy production would be 348'300 kWh and the production cost 0.13 CHF/kWh. Variant B includes important modifications in the construction - especially the dam and the channels. Two turbines with a total maximum power output of 118 kW are foreseen. The annual energy production would be 448'500 kWh and the production cost 0.15 CHF/kWh. Due to these findings, variant A is preferred and proposed for realization

Availability note (English)

Available from INIS in electronic form; Also available from OSTI; Commercial reproduction prohibited; OSTI as DE20941202

Files

39005373.pdf

Files (6.2 MB)

Name Size Download all
md5:b1216b5a85be6965e74462c35674b5b3
6.2 MB Preview Download

System files (81.5 kB)

Name Size Download all

Additional details

Additional titles

Original title (French)
Projet de rehabilitation d'une centrale hydro-electrique au moulin de Noiraigue. Etude de faisabilite

Publishing Information

Imprint Pagination
51 p.