Published 2007 | Version v1
Journal article

Status report of the MS-ECRIS construction

  • 1. NIPNE, Bucharest, (Romania)
  • 2. CEA, DRFMC, SBT, Grenoble, (France)
  • 3. CERN AB Dept, Geneva, (Switzerland)
  • 4. Svedberg Lab, S-75121 Uppsala, (Sweden)
  • 5. Univ Groningen, Kernfys Versneller Inst, NL-9747 AA Groningen, (Netherlands)
  • 6. Grand Accelerateur Natl Ions Lourds, F-14021 Caen, (France)
  • 7. Univ Jyvaskyla, Dept Phys, Jyvaskyla, (Finland)
  • 8. Gesell Schwerionenforsch mbH, Darmstadt, (Germany)
  • 9. Ist Nazl Fis Nucl, Lab Nazl Legnaro, I-35020 Legnaro, (Italy)
  • 10. Ist Nazl Fis Nucl, Lab Nazl Sud, I-95123 Catania, (Italy)

Description

The design of each component of the Multipurpose Superconducting ECR Ion Source (MS-ECRIS) has been completed and some items are ready. The magnets and the cryostat are under construction at ACCEL and the commissioning is scheduled for March 2007. The mechanical have been optimized and their construction is under way, the microwave system is under refurbishment and the 65 kV power supply is available and upgraded for afterglow operations. Pumping and extraction system were adapted to the EIS test-bench of GSI Darmstadt. The description of each part will be given in the paper along with a schedule of the forthcoming development and experiments. (authors)

Additional details

Publishing Information

Journal Title
High Energy Physics and Nuclear Physics
Journal Volume
31
Journal Page Range
p. 13-17
ISSN
0254-3052