Published October 2012 | Version v1
Miscellaneous

Commissioning plan of the klystron and modulator system for 100MeV proton accelerator

  • 1. Korea Atomic Energy Institute, Daejeon (Korea, Republic of)

Description

Proton Engineering Frontier Project (PEFP) is developing a 100MeV proton linear accelerator for basic science research and industrial applications. The installation of the klystron and modulator system for 100MeV proton accelerator starts in September 2012 when the modulator room and the klystron gallery are prepared in the accelerator building at Gyeongju. There are total 9 sets of klystron for the 100MeV proton accelerator and 4 sets of modulator to power the klystrons. Each 3 sets of modulator drive the 2 sets of klystron simultaneously and the last one drives 3 sets of klystron in parallel. After the proper installation, the commissioning of the system starts step by step from the low power test of the modulator to high power test of the klystron. In this paper, a brief introduction of the installation and commissioning plan of the klystron and modulator system are presented

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2012 autumn meeting of the KNS
Dates
24-26 Oct 2012
Place
Kyoungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
44062901
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
COMMISSIONING; KLYSTRONS; LINEAR ACCELERATORS; PLANNING; PROTONS
Descriptors DEC
ACCELERATORS; BARYONS; ELECTRON TUBES; ELECTRONIC EQUIPMENT; ELEMENTARY PARTICLES; EQUIPMENT; FERMIONS; HADRONS; MICROWAVE EQUIPMENT; MICROWAVE TUBES; NUCLEONS

Optional Information

Notes
2 refs, 2 figs