Published 2010 | Version v1
Miscellaneous

Pickering NGS B - Unit 6 strategy to remove fuel defects during operation at high power

  • 1. Ontario Power Generation, Pickering NGS, Reactor Physics, Pickering, Ontario (Canada)

Description

Unit 6 was operating at high power (100% FP) with all the adjuster rods (AAs) in core when Chemistry sample results of HTS I-131 activity increased from 1.65 μCi/kg (base line) to 5.4 μCi/kg. Sustained elevated activity levels and subsequently numerous significant spikes have lead to the conclusion that the Unit 6 core contains defected fuel bundles. 34 channels have been identified by Reactor Physics, as possible locations containing defective fuel bundles. Reactor Physics has developed a set of criteria, to be used in prioritizing the sequence of channel re-fuelling and defect removal. The refuelling strategy was successfully implemented in February 2009, all the suspect channels were twice fuelled and any potential defected fuel bundle was discharged by end of summer 2009. (author)

Part of:
Flexible fuel for the future. 11th international conference on CANDU fuel

Additional details

Publishing Information

Publisher
Canadian Nuclear Society
Imprint Place
Toronto, Ontario (Canada)
Imprint Title
Flexible fuel for the future. 11th international conference on CANDU fuel
Imprint Pagination
60.9 Megabytes
Journal Page Range
[10 p.]

Conference

Title
11. International conference on CANDU fuel
Dates
17-20 Oct 2010
Place
Niagara Falls, Ontario (Canada)

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
47028637
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
FUEL ELEMENT CLUSTERS; FUEL ELEMENT FAILURE; PICKERING SITE; REACTOR FUELING; REACTOR PHYSICS
Descriptors DEC
FAILURES; FUEL ASSEMBLIES; PHYSICS; REACTOR SITES

Optional Information

Notes
1 tab., 3 figs.