Published April 1999 | Version v1
Journal article

Status of the first batch of niobium resonator production for the New Delhi booster linac

  • 1. Nuclear Science Centre, Aruna Asaf Ali Marg, New Delhi 110067 (India)
  • 2. Physics Division, Argonne National Laboratory, Argonne, Illinois 60439 (United States)

Description

This paper reports the status and details of the costs of construction of niobium superconducting resonant cavities for a linear accelerator, presently being built as a booster for the 15 UD tandem Pelletron accelerator at the Nuclear Science Centre, New Delhi. The linear accelerator will have three cryostal modules, each holding eight quarter-wave resonators. Construction of a batch of ten resonators for the linac started at Argonne National Laboratory in May 1997. For production, all fabrication and all electron beam welding is being done through commercial vendors. Details of construction and present status of the project are presented. copyright 1999 American Institute of Physics

Additional details

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
473
Journal Issue
1
Journal Page Range
p. 236-243
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
8. international conference on heavy ion accelerator technology
Dates
5-10 Oct 1998
Place
Argonne, IL (United States)

Optional Information

Secondary number(s)
CONF-981087--