Published August 31, 1970
| Version v1
Report
Restricted
Peach Bottom Atomic Power Station, Units 2 and 3. Final safety analysis report, Vol. 3. ) 7Preliminary safety analysis report, Amendment 7{. )]
Creators
Description
no abstract available
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 315 p.
- Report number
- DOCKET-50277--13
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 2004752
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ACCIDENTS; CONFIGURATION; CONTROL SYSTEMS; COOLANT LOOPS; DESIGN; INSTRUMENTS; OPERATION; REACTOR SAFETY; SAFETY; ECCS; PEACH BOTTOM REACTOR; POWER REACTORS; SAFETY ANALYSIS REPORT
Optional Information
- Secondary number(s)
- DOCKET-50278--13.