Published 2001 | Version v1
Report Open

Risk informed decision making for the allowed outage times changes

  • 1. RELKO Ltd., Engineering and Consulting Services, Bratislava (Slovakia)

Description

The paper describes the methods for risk informed evaluation of the allowed outage times. Applications of the methods are also provided for the safety related equipment of the J. Bohunice V2 NPP. (author)

Files

32046311.pdf

Files (80.8 kB)

Name Size Download all
md5:1ec6c3723b79343e95fdf6bb05410529
80.8 kB Preview Download
Part of:
International conference on topical issues in nuclear safety. Contributed papers

Additional details

Publishing Information

Imprint Title
International conference on topical issues in nuclear safety. Contributed papers
Imprint Pagination
298 p.
Journal Page Range
p. 15-18
Report number
IAEA-CN--82

Conference

Title
International conference on topical issues in nuclear safety
Dates
3-6 Sep 2001
Place
Vienna (Austria)

INIS

Country of Publication
International Atomic Energy Agency (IAEA)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
32046311
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BOHUNICE V-2 REACTOR; CALCULATION METHODS; DECISION MAKING; DECISION TREE ANALYSIS; PROBABILISTIC ESTIMATION; RISK ASSESSMENT; SAFETY ANALYSIS
Descriptors DEC
ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS

Optional Information

Notes
3 refs; E-mail: relko@relko.sk
Secondary number(s)
IAEA-CN--82/25