Published November 2008 | Version v1
Miscellaneous

Present status and future plan of JMTR project

  • 1. Japan Atomic Energey Agency, Ibaraki (Japan)

Description

The Japan Materials Testing Reactor (JMTR) of Japan Atomic Energy Agency (JAEA) is a light water cooling tank typed reactor with first criticality in March 1968. The JMTR has been applied to fuel/material irradiation examinations for LWRs, HTGR, fusion reactor and RI production. Owing to the connection between the JMTR and hot laboratory by a canal, easy re-irradiation tests can conduct with safety and quick transportation of irradiated samples. The JMTR operation was stopped in August 2006 in order to conduct its refurbishment. The reactor facilities will be refurbished during four years from the beginning of FY 2007, and necessary examination and work are carrying out on schedule. The renewed JMTR will be started from FY 2011, and be operated for a record of about 20 years (until around FY 2030). The usability improvement of the JMTR,e.g. higher reactor available factor, shortening turnaround time to get irradiation results, attractive irradiation cost, business confidence, is also discussing as the preparations for re-operation

Part of:
Proceedings of 2008 KAERI/JAEA Joint Seminar on Advanced Irradiation and PIE Technologies

Additional details

Publishing Information

Publisher
KAERI
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of 2008 KAERI/JAEA Joint Seminar on Advanced Irradiation and PIE Technologies
Imprint Pagination
455 p.
Journal Page Range
p. 15-24

Conference

Title
2008 KAERI/JAEA Joint Seminar on Advanced Irradiation and PIE Technologies
Dates
5-7 Nov 2008
Place
Daejeon (Korea, Republic of)

INIS

Optional Information

Notes
4 refs, 5 figs