Published September 1987
| Version v1
Journal article
Economical efficiency of nuclear power unit with WWER at extended operating cycle duration
Description
Economical efficiency of an extended operating cycle length of nuclear power units with WWER-440 both at constant and alternating pressure in the secondary circuit is estimated. Operation of the WWER-440 power unit at extended operating cycle length at alternating parameters in the secondary circuit is most economical as compared with the regime at constant or limited by minimum permissible pressure value in the secondary circuit
Additional details
Additional titles
- Original title (Russian)
- Экономическая эффективность работы атомного энергоблока с ВВЭР в режиме продления кампании
Publishing Information
- Journal Title
- Ehlektr. Stn.
- Journal Issue
- no.9
- Series
- Ehlektr. Stn.
- ISSN
- 0013-5372
- CODEN
- EKSTA
INIS
- Country of Publication
- Russian Federation
- Country of Input or Organization
- USSR
- INIS RN
- 19068801
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- BURNUP; COST; EFFICIENCY; NUCLEAR POWER PLANTS; NUMERICAL SOLUTION; REACTOR OPERATION; TIME DEPENDENCE; WWER TYPE REACTORS
- Descriptors DEC
- ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; OPERATION; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS