Published 1992 | Version v1
Book

The ACR issue resolution process

  • 1. Wisconsin Electric Power Co., Milwaukee, WI (United States)
  • 2. Edison Electric Inst., Washington, DC (United States)
  • 3. Energy Resources International Inc., Washington, DC (United States)

Description

This paper reports that since 1987, representatives of utilities owning spent nuclear fuel have engaged in staff-to-staff technical exchanges with the Department of Energy (DOE) through the Annual Capacity Report (ACR) issue Resolution Process to identify, prioritize and resolve issues related to the implementation of the Standard Contract for the Disposal of Spent Fuel. The Standard Contract sets the framework for the transfer of spent fuel from reactor sites to the DOE waste management system currently under development. Resolution of these open issues should aid DOE in establishing a functional, efficient and equitable system for accepting spent fuel from many diverse reactor sites, while also providing utilities with maximum flexibility in making practical and economical site-specific spent fuel management decisions

Additional details

Publishing Information

Publisher
American Nuclear Society.
Imprint Place
La Grange Park, IL (United States)
ISBN
0-87262-891-4
Imprint Title
Proceedings of high level radioactive waste management
Imprint Pagination
2425 p.
Journal Page Range
p. 173-177.

Conference

Title
3. international high level radioactive waste management (IHLRWM) conference.
Dates
12-16 Apr 1992.
Place
Las Vegas, NV (United States).

Optional Information

Secondary number(s)
CONF-920430--.