Ambiguity aversion and the expected cost of rare energy disasters, an application to nuclear power accidents - Working Paper 16-CER-01
Creators
- 1. MINES ParisTech, PSL Research University, Cerna - Centre for industrial economics, i3, CNRS UMR 9217 (France)
Description
Assessing the risks of rare disasters due to the production of energy is paramount when making energy policy decisions. Yet, the costs associated with these risks are most often not calculable due to the high uncertainties that characterize their potential consequences. In this paper, we propose a non-Bayesian method for the calculation of the expected cost of rare energy disasters, that accounts for the ambiguity that characterizes the probabilities of these events. Ambiguity is defined as the existence of multiple and conflicting sources of information regarding the probabilities associated with these events. We then apply this method to the particular case of nuclear accidents in new builds. Our results suggests that the upper-bound of the expected cost of such accidents is 1.7 Euros/MWh, which is consistent with most of the recent estimates. This expected cost may rise to 7 Euros/MWh when the macroeconomic shock caused by a nuclear accident is taken into account. (authors)
Files
Additional details
Publishing Information
- Imprint Pagination
- 33 p.
- Report number
- INIS-FR--21-1086
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 52083592
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- COST ESTIMATION; DECISION MAKING; NUCLEAR DAMAGE; PROBABILISTIC ESTIMATION; PUBLIC OPINION; REACTOR ACCIDENTS; REACTOR SAFETY; RISK ASSESSMENT; SENSITIVITY ANALYSIS
- Descriptors DEC
- ACCIDENTS; CALCULATION METHODS; SAFETY
Optional Information
- Notes
- 62 refs.; Available from the INIS Liaison Officer for France, see the INIS website for current contact and E-mail addresses