Results of the 6th regular inspection of No. 1 plant in Mihama Power Station, Kansai Electric Power Co., Inc

Creators

Description

The 6th periodical inspection on Unit 1 in the Mihama Power Station was made for the period of July to December 1984. Inspection was made in the following: reactor proper, reactor cooling system, instrumentation and control system, radiation control facility, etc. By external appearance observation, disassembly, performance test, etc. there were observed no abnormalities. Personnel radiation exposure doses during the inspection were below the permissible level. The following modification etc. works were done in the periodical inspection: replacement of the accumulator safety valve, replacement of the out-reactor nuclear instrumentation panel, installation of accident-time monitors, replacement of the control-rod cluster guide tube support pins, alteration in the fuel enrichment. (Mori, K.)

Additional details

Publishing Information

Journal Title
Genshiryoku Anzen Iinkai Geppo
Journal Issue
no.77
Series
Genshiryoku Anzen Iinkai Geppo.
CODEN
GAIGD