Published April 2012 | Version v1
Journal article

Status of J-PARC MR

  • 1. High Energy Accelerator Research Organization, J-PARC Center, Tokai, Ibaraki (Japan)

Description

The J-PARC main ring synchrotron (MR) has started users operation since 2009. The MR has two beam extraction systems. One is a fast extraction system for beam delivery to the neutrino beam line of the Tokai-to-Kamioka (T2K) experiment. Other is a slow extraction system for beam delivery to the hadron experimental hall. After nine-month beam shutdown caused by the Great East Japan Earthquake, the J-PARC facility resumed beam operation since December 2012. The MR delivers the 150 kW beam to the T2K experiment and 3-5 kW beam to users in the hadron experimental hall. In this paper, status of the MR high power beam operation is presented. Some improvements planned in near future for the beam intensity upgrade are also discussed. (author)

Additional details

Publishing Information

Journal Title
Kasokuki
Journal Volume
9
Journal Issue
1
Journal Page Range
p. 30-40
ISSN
1349-3833

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
45043340
Subject category
S43: PARTICLE ACCELERATORS;
Descriptors DEI
BEAM EXTRACTION; BEAM OPTICS; BEAM TRANSPORT; COMMISSIONING; DAMAGE; EXCEPTIONAL NATURAL DISASTER; GEV RANGE 10-100; J-PARC
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; ENERGY RANGE; GEV RANGE; NATURAL DISASTERS; SYNCHROTRONS

Optional Information

Notes
20 refs., 21 figs., 1 tab.