On results of third regular inspection of No. 2 plant in Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc
Description
The third regular inspection of No. 2 plant in the Genkai Nuclear Power Station was carried out from July 22 to October 16, 1984. It took 60 days from the parallel off to the parallel operation on September 19. The results of this regular inspection were as follows. The object facilities of the inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generating system. The appearance, disassembling, leak, function, performance and other inspections were carried out on the above object facilities, but abnormality was not found. The works related to this regular inspection were accomplished within the range of allowable radiation dose based on the relevant laws. The main reconstruction works carried out during this regular inspection were the installation of gas monitors for exactly grasping conditions of the time of an accident. (Kako, I.)
Additional details
Publishing Information
- Journal Title
- Genshiryoku Anzen Iinkai Geppo
- Journal Issue
- no.75
- Series
- Genshiryoku Anzen Iinkai Geppo.
- CODEN
- GAIGD
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 17055423
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- GENKAI-2 REACTOR; INSPECTION; RADIATION DOSES; REACTOR MAINTENANCE; REACTOR SAFETY
- Descriptors DEC
- ENRICHED URANIUM REACTORS; MAINTENANCE; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SAFETY; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS