Published November 14, 1997 | Version v1
Report Restricted

Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

  • 1. Westinghouse Savannah River Company, AIKEN, SC (United States)

Description

Under the Tritium Facility Modernization ampersand Consolidation (TFM ampersand C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM ampersand C Project also provides for a new replacement R ampersand D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE98052037; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
98 p.
Report number
WSRC-TR--97-00368