A study for the establishment of regulatory requirement and evaluation guide for station blackout in nuclear power plants

  • 1. KINS, Taejon (Korea, Republic of)

Description

The consequence of SBO event could be a severe accident unless AC power was restored within a proper time, because many safety systems depend upon AC power. Based on the severity, the SBO has been extensively studied since it was identified as Unresolved Safety Issue at USNRC. The resolution of those studies is a rule-making such as 10 CFR 50.63 and Regulatory Guide 1.155. But there is no regulatory requirements of SBO for an operating domestic nuclear power plant up to the present time. This tudy has established SBO rule(regulatory requirements and evaluation guides) for an operating PWR type of the operating nuclear power plants in Korea

Part of:
Proceedings of the Korean Nuclear Society spring meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Taejon (Korea, Republic of)
Imprint Title
Proceedings of the Korean Nuclear Society spring meeting
Imprint Pagination
[one CD-ROM]
Journal Page Range
[11 p.]

Conference

Title
1999 spring meeting of the Korean Nuclear Society
Dates
28-29 May 1999
Place
Pohang (Korea, Republic of)

INIS

Optional Information

Notes
12 refs