Published October 2011 | Version v1
Miscellaneous

Probability Analysis of the Construction Cost of an APR1000 Single Unit

  • 1. KHNP Central Research Institute, Daejeon (Korea, Republic of)

Description

The nuclear power plant market is expected to grow rapidly in order to address issues of global warming, cutting CO2 emissions and securing stable electricity supplies. Under these circumstances, the main primary goal of the APR1000 development is to ensure export competitiveness in the developing countries in the Middle East and Southeast Asia. To that end, APR1000 (1,000MWe, 3rd generation) will be developed based on the OPR1000 (Korean standard nuclear power plant, 2.5 generation) by incorporating and improving the general requirements such as the 60 year design life time, comprehensive site requirement of 0.3g seismic design, stability improvement, operability improvement and provisions for severe accidents. The APR1000 adds 16 advanced design features to its predecessor, as outlined below in Table 1

Part of:
Proceedings of Korean Nuclear Society, Daejeon (KR)

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2011 autumn meeting of the KNS
Dates
26-28 Oct 2011
Place
Kyoungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
43045652
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
COST; DESIGN; NUCLEAR POWER PLANTS; PROBABILITY; PWR TYPE REACTORS; REACTOR ACCIDENTS
Descriptors DEC
ACCIDENTS; ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
5 refs, 3 figs, 3 tabs