Published March 1990
| Version v1
Miscellaneous
Open
TASCC newsletter. Vol. 4 no. 3
Description
Five new beams were extracted from the cyclotron during two development runs, achieving two targets in the commissioning schedule: production of a beam at low magnetic field, and production of the 20th cyclotron beam. A carbon beam was produced and analyzed from the second ion source deck, completing its commissioning. The high energy tandem foil stripper was fully commissioned and is now available. (L.L.)
Availability note (English)
MF available from INIS under the Report Number.Files
24059346.pdf
Files
(98.2 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:b07c2c8f501a0fdff82fcb8cb1c8b423
|
98.2 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 4 p.
- Report number
- INIS-mf--13655
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 24059346
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- CRNL MP TANDEM ACCELERATOR; CRNL SUPERCONDUCTING CYCLOTRON; RESEARCH PROGRAMS
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; ELECTROSTATIC ACCELERATORS; HEAVY ION ACCELERATORS; ISOCHRONOUS CYCLOTRONS; TANDEM ELECTROSTATIC ACCELERAT; VAN DE GRAAFF ACCELERATORS