Published December 2005 | Version v1
Miscellaneous

Wind power, network congestion and hydro resource utilisation in the Norwegian power market

Description

Capacity constraints in electricity networks can have important impacts on utilization of new renewable energy (RE) capacity and incumbent generation resources. Neglect of such impacts in development of RE resources can result in crowding-out of incumbent generation. This trade-off is particularly problematic if the incumbent generation also consists of renewable sources, such as hydropower in the Norwegian electricity system. This paper presents a numerical analysis of the current wind-power development plans in North Norway and their impacts on utilization of hydropower. Policy simulations in paper are conducted using a dynamic partial equilibrium model that is calibrated to reflect the structure of the Nordic power market. The paper draws conclusion and policy implications for integration of RE resources in the Norwegian power market. (Author)

Part of:
European Energy Markets in Transition

Additional details

Identifiers

Publishing Information

Imprint Title
European Energy Markets in Transition
Imprint Pagination
vp.
Journal Page Range
p. 1

Conference

Title
7. IAEE European Energy Conference
Dates
28-30 Aug 2005
Place
Bergen (Norway)

Optional Information

Notes
This record replaces 38001757