Published March 12, 2015 | Version v1
Report Open

Design Provisions for Station Blackout at Nuclear Power Plants

  • 1. International Atomic Energy Agency - IAEA, Vienna (Austria)

Description

A station blackout (SBO) is generally known as 'a plant condition with complete loss of all alternating current (AC) power from off-site sources, from the main generator and from standby AC power sources important to safety to the essential and nonessential switchgear buses. Direct current (DC) power supplies and un-interruptible AC power supplies may be available as long as batteries can supply the loads. Alternate AC power supplies are available'. A draft Safety Guide DS 430 'Design of Electrical Power Systems for Nuclear Power Plants' provides recommendations regarding the implementation of Specific Safety Requirements: Design: Requirement 68 for emergency power systems. The Safety Guide outlines several design measures which are possible as a means of increasing the capability of the electrical power systems to cope with a station blackout, without providing detailed implementation guidance. A committee of international experts and advisors from numerous countries is currently working on an IAEA Technical Document (TECDOC) whose objective is to provide a common international technical basis from which the various criteria for SBO events need to be established, to support operation under design basis and design extension conditions (DEC) at nuclear power plants, to document in a comprehensive manner, all relevant aspects of SBO events at NPPs, and to outline critical issues which reflect the lessons learned from the Fukushima Dai-ichi accident. This paper discusses the commonly encountered difficulties associated with establishing the SBO criteria, shares the best practices, and current strategies used in the design and implementation of SBO provisions and outline the structure of the IAEA's SBO TECDOC under development. (author)

Files

46066631.pdf

Files (653.8 kB)

Name Size Download all
md5:a4a76e02e0f8601518db6db3c98ae6ce
653.8 kB Preview Download
Part of:
Robustness of Electrical Systems of Nuclear Power Plants in Light of the Fukushima Daiichi Accident (ROBELSYS). Workshop Proceedings, Paris, France, 1-4 April 2014. Appendix 2 (Cont'd) and Appendix 3 - Robustness of Electrical Systems of NPP's in Light of the Fukushima Daiichi Accident. ROBELSYS Workshop Proceedings. Appendices 2 and 3

Additional details

Publishing Information

Imprint Title
Robustness of Electrical Systems of Nuclear Power Plants in Light of the Fukushima Daiichi Accident (ROBELSYS). Workshop Proceedings, Paris, France, 1-4 April 2014. Appendix 2 (Cont'd) and Appendix 3 - Robustness of Electrical Systems of NPP's in Light of the Fukushima Daiichi Accident. ROBELSYS Workshop Proceedings. Appendices 2 and 3
Imprint Pagination
362 p.
Journal Page Range
p. 127-143
Report number
NEA-CSNI-R--2015-4-ADD1

Conference

Title
ROBELSYS Workshop on the Robustness of Electrical Systems of NPP's in Light of the Fukushima Daiichi Accident
Dates
1-4 Apr 2014
Place
Paris (France)