Published 2003 | Version v1
Report Open

New cooling system of the FRG-1 two barrier system of the primary coolant cycle

Description

The GKSS research center operates the swimming pool reactor FRG-1 with a thermal power of 5 MW as national neutron source for neutron scattering experiments and sample irradiation as well. Before changing the primary coolant cycle consisted of the reactor core and the closed piping including pumps, heat exchanger and delay tank. The closed cooling circuit was located underneath the reactor pool, in the so-called radioactive cellar. This piping system served secondary coolant system. Due to the location of the primary coolant cycle below the operation pool a postulated 2-F line break and simultaneous failure of the pool slide gate valve could lead to a falling dry of the total reactor core. the new primary coolant system was built in the beginning 2002 in a partitioned cell all within the radioactive cellar, so that the reactor core remains with water with the assumed incident. Due to the new two barrier-inclusion of the primary circuit only the melting of two fuel plates (from total 252 fuel plates) has to be taken into account. This measure and the core compactness in 2000 with a neutron flux gain of a factor of 2 makes the FRG-1 ready for the next 15 years of reactor operation. (author)

Files

36019470.pdf

Files (112.9 kB)

Name Size Download all
md5:3831cee061ed111516f8166202355d73
112.9 kB Preview Download
Part of:
IGORR 9: Proceedings of the 9. meeting of the International Group On Research Reactors

Additional details

Publishing Information

Imprint Title
IGORR 9: Proceedings of the 9. meeting of the International Group On Research Reactors
Imprint Pagination
346 p.
Journal Page Range
[3 p.]
Report number
INIS-XA-C--030

Conference

Title
9. meeting of the International Group On Research Reactors
Acronym
IGORR 9
Dates
24-28 Mar 2003
Place
Sydney (Australia)

Optional Information

Notes
1 ref., 2 figs