Published August 23, 2010
| Version v1
Miscellaneous
Neutron Fluences and Radiation Damage Parameters for the HFIR-MFE-RB-14J Experiment
Description
The HFIR-MFE-RB-14J experiment was conducted in the unshielded removable beryllium (RB) position of HFIR. The irradiation of the assembly occurred for two separated time periods. The first irradiation was from June 3, 1999 to August 27, 1999. The second irradiation period was from January 27, 2000 until June 6, 2000. The total exposure was for 14293 FPD (full power days). Reactor dosimetry capsules were analyzed and the activation data were used to provide the best estimates of the neutron fluences and radiation damage parameters as a function of height relative to midplane of the reactor.
Availability note (English)
Available from Oak Ridge National Laboratory, Oak Ridge, TN (US)Additional details
Publishing Information
- Publisher
- Oak Ridge National Laboratory
- Imprint Place
- Oak Ridge, TN (United States)
- Imprint Pagination
- vp.
- Report number
- DOE/ER--0313/v.48
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 42009783
- Subject category
- S07: ISOTOPES AND RADIATION SOURCES;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- DOSIMETRY; HFIR REACTOR; IRRADIATION; NEUTRON FLUENCE; RADIATION EFFECTS
- Descriptors DEC
- ENRICHED URANIUM REACTORS; IRRADIATION REACTORS; ISOTOPE PRODUCTION REACTORS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; TANK TYPE REACTORS; TEST FACILITIES; TEST REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Contract/Grant/Project number
- 830403000; AC05-76RL01830
- Notes
- Fusion Materials Semiannual Progress Report for the Period Ending June 30, 2010, DOE-ER-0313/48, 149-153
- Funding organization
- US Department of Energy (United States)