Published October 11, 1976 | Version v1
Report Restricted

Evaluation of fuel cycle options for plutonium utilization: 1976 study. Final report

Description

The study was conducted to reconcile an existing divergence of opinion on the value of plutonium recycle in light water reactors. Included were a parametric study of the effect of the primary variables, the assumed costs of U3O8 and reprocessing. A concerted effort was devoted to develop a realistic estimate of the most likely cost of reprocessing light water reactor fuel. Computations were based upon the 1975 ERDA moderate-low prediction of a nuclear electrical capacity of 800 GWe in the year 2000. Reprocessing costs for LWR fuel were estimated to be $150/kg of heavy metal (1975 dollars) with an associated range of $100/kg to $250 kg. The analysis showed that even with the pessimistic value, plutonium recycle is economically preferable to a no-recycle mode of fuel management

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS. PC A05/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
76 p.
Report number
PB--271492

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
9389974
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Descriptors DEI
COMPARATIVE EVALUATIONS; COST; FORECASTING; FUEL CYCLE; PLUTONIUM RECYCLE; REPROCESSING; USA; WATER COOLED REACTORS
Descriptors DEC
NORTH AMERICA; REACTORS; SEPARATION PROCESSES