Published August 12, 1999 | Version v1
Report

Seismic Adequacy Review of PC012 SCEs that are Potential Seismic Hazards with PC3 SCEs at Cold Vacuum Dryer (CVD) Facility; FINAL

Description

This document provides seismic adequacy review of PCO12 Systems, Components L Equipment anchorage that are potential seismic interaction hazards with PC3 SCEs during a Design Basis Earthquake. The PCO12 items are identified in the Safety Equipment List as 3/1 SCEs

Availability note (English)

Available from OSTI as DE00797683; www.osti.gov/servlets/purl/797683-douSeC/native/; www.osti.gov/servlets/purl/797683-yqDUlZ/webviewable/

Additional details

Publishing Information

Imprint Pagination
61 p.
Report number
HNF--4291,Rev.0

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33066640
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
DESIGN; DRYERS; EQUIPMENT; SAFETY ENGINEERING; SEISMIC EFFECTS; SPENT FUELS; VACUUM SYSTEMS
Descriptors DEC
ENERGY SOURCES; ENGINEERING; FUELS; MATERIALS; NUCLEAR FUELS; REACTOR MATERIALS

Optional Information

Contract/Grant/Project number
AC06-96RL13200
Funding organization
ENVIRONMENTAL MANAGEMENT (United States)