Published August 25, 1999 | Version v1
Report Open

Engineering Analysis of Characterization Ramps and Platforms

Description

The calculations in Appendix A and B determine the adequacy of the ramps and platforms to accomplish two tasks: (1) Core sampling using the modifications imposed by the use of a FDNW foundation at PFP; and (2) Core sampling within the 200E and 200W Tank Farms without the imposed modifications. The calculations in this document determined that the ramps and platforms are adequate for use with core sampling equipment when sampling either tank 241-2-361 or within 200E or 200W Tank Farms. When sampling tank 241-2-361 the modifications made by ECN 651132 must be implemented. These modifications are the addition of diagonal cross bracing on both the lateral and longitudinal sides. Also, a 1 1/4 inch tie rod must connect both bases of each longitudinal side

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00797685; PURL: https://www.osti.gov/servlets/purl/797685-UgEHvF/webviewable/

Files

34009239.pdf

Files (1.1 MB)

Name Size Download all
md5:2babd5bd49b80858e1909c10d39f9b8b
1.1 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
41 p.
Report number
HNF--4320

INIS

Optional Information

Contract/Grant/Project number
AC06-96RL13200
Funding organization
ENVIRONMENTAL MANAGEMENT (United States)