Published September 1993 | Version v1
Report Open

Road Transportable Analytical Laboratory system

Description

This developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze (radioanalytes, and organic and inorganic chemical analytes) 20 samples per day at the highest levels of quality assurance and quality control. It dramatically reduces the turnaround time for environmental sample analysis from 45 days (at a central commercial laboratory) to 1 day. At the same time each RTAL system will save the DOE over $12 million per year in sample analysis costs compared to the costs at a central commercial laboratory. If RTAL systems were used at the eight largest DOE facilities (at Hanford, Savannah River, Fernald, Oak Ridge, Idaho, Rocky Flats, Los Alamos, and the Nevada Test Site), the annual savings would be $96,589,000. The DOE's internal study of sample analysis needs projects 130,000 environmental samples requiring analysis in FY 1994, clearly supporting the need for the RTAL system. The cost and time savings achievable with the RTAL system will accelerate and improve the efficiency of cleanup and remediation operations throughout the DOE complex

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94004053; NTIS; US Govt. Printing Office Dep.

Files

25046874.pdf

Files (21.3 MB)

Name Size Download all
md5:80ed32bb3f5ccd19d173a9d7c2d5c72f
21.3 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Phase 1

Publishing Information

Imprint Pagination
275 p.
Report number
DOE/MC/29109--3634

Optional Information

Contract/Grant/Project number
Contract AC21-92MC29109
Funding organization
USDOE, Washington, DC (United States).