Reliability analysis for LEB ring magnet power system in SSC
Description
The LEB ring magnet power system contains six subsystems, supervisory control, power supplies, regulation, DC bus, resonant cells, and fault sensing network. The system availability of the total LEB RMPS is required to by 0.999. The work in this paper is to allocate the overall LEB RMPS reliability requirement into reliability requirements for each of the subsystems and lower-tier items. The Feasibility-of-Objective technique combining with engineering experience is the key for the allocation. MIL-HDBK-217F is used to derate SCR components
Additional details
Publishing Information
- Journal Title
- IEEE Transactions on Nuclear Science
- Journal Volume
- 39
- Journal Issue
- 4
- Journal Page Range
- p. 1170-1174.
- ISSN
- 0018-9499
- CODEN
- IETNAE
Conference
- Title
- 1991 Institute of Electrical and Electronic Engineers (IEEE) nuclear science symposium and medical imaging conference.
- Dates
- 2-9 Nov 1991.
- Place
- Santa Fe, NM (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 24033170
- Subject category
- S43: PARTICLE ACCELERATORS; S43: PARTICLE ACCELERATORS; S75: CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND SUPERFLUIDITY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM FOCUSING MAGNETS; DESIGN; POWER SYSTEMS; RELIABILITY; SUPERCONDUCTING MAGNETS; SUPERCONDUCTING SUPER COLLIDER
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; ELECTRICAL EQUIPMENT; ELECTROMAGNETS; EQUIPMENT; MAGNETS; STORAGE RINGS; SUPERCONDUCTING DEVICES; SYNCHROTRONS
Optional Information
- Secondary number(s)
- CONF-911106--.