Development of a regulatory framework for risk-informed decision making
Creators
- 1. Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)
- 2. Seoul National University, Seoul (Korea, Republic of)
Description
After the Fukushima Daiichi accidents, public concerns on nuclear safety and the corresponding burden of nuclear power plant licensees are increasing. In order to secure public trust and enhance the rationality of current safety regulation, we develop a risk-informed decision making (RIDM) framework for the Korean regulatory body. By analyzing all the regulatory activities for nuclear power plants in Korea, eight action items are selected for RIDM implementation, with appropriate procedures developed for each. For two items in particular - the accident sequence precursor analysis (ASPA) and the significance determination process (SDP) - two customized risk evaluation software has been developed for field inspectors and probabilistic safety assessment experts, respectively. The effectiveness of the proposed RIDM framework is demonstrated by applying the ASPA procedure to 35 unplanned scrams and the SDP to 24 findings from periodic inspections.
Additional details
Publishing Information
- Journal Title
- Nuclear Engineering and Technology
- Journal Volume
- 52
- Journal Issue
- 1
- Series
- 22 refs, 11 figs, 4 tabs
- Journal Page Range
- p. 69-77
- ISSN
- 1738-5733
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 51108585
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- DECISION MAKING; EVALUATION; FUKUSHIMA DAIICHI NUCLEAR POWER STATION; INSPECTION; NUCLEAR POWER PLANTS; PROBABILISTIC ESTIMATION; REACTOR ACCIDENTS; REGULATIONS; REPUBLIC OF KOREA; RISK ASSESSMENT; SAFETY; SCRAM
- Descriptors DEC
- ACCIDENTS; ASIA; CALCULATION METHODS; DEVELOPING COUNTRIES; LAWS; NUCLEAR FACILITIES; POWER PLANTS; REACTOR LIFE CYCLE; REACTOR SHUTDOWN; REACTOR SITES; SHUTDOWN; THERMAL POWER PLANTS