Published September 2018 | Version v1
Journal article

Public participation in EIA: A comparative study of the projects run by government and non-governmental organizations

  • 1. School of Geography, Environment and Earth Sciences, Victoria University of Wellington, Kelburn Parade, PO Box 600, Wellington 6140 (New Zealand)
  • 2. Department of City and Regional Planning, King Fahd University of Petroleum and Minerals, Dhahran 31261 (Saudi Arabia)

Description

Assuring public participation in different stages of environmental impact assessment (EIA) is essential since the success of a project largely depends on its type, nature, and process. Before starting a development project in Bangladesh, both government organizations (GOs) and non-government organizations (NGOs) need to conduct an EIA. However, in most of the governmental projects, there is still no significant influence of public participation in EIA. Contrarily, under NGO administered projects, the systematic participation in EIA is quite unknown and often goes without being acknowledged. This paper, thus, studies public participation practice in EIA through an investigation of two NGO governed projects (i.e., BRAC's fisheries and sericulture project and CARE's integrated food for work program) and compares with two projects by GOs (i.e., Rampal coal-based thermal power plant project and Jamuna multipurpose bridge project) to critically understand the prevailing differences. As well, pivotal factors responsible for differentiated nature and type of public participation being practiced within a certain institutional context are examined. The study indicates that NGOs tend to ensure participation of the pertinent stakeholders at different stages of an EIA while harnessing their inputs to successfully complete a project. By contrast, public participation in government's run projects is mostly found to be carried out towards the end of an EIA exercise, which severely limits the stakeholders' ability to contribute and questions the legitimacy of such attempt. This process of neglect systematically overlooks stakeholders' concerns, critics, and suggestions while pre-emptive motive of the project gets glorified and implemented. By tapping these voids, this study attempts to offer an insightful understanding of the gap between conventional 'practice' and formal 'pledge' when comes to ensuring public participation in various stages of EIA. This study expects to benefit other countries where NGOs are considerably involved in development projects.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.eiar.2018.05.001

Additional details

Identifiers

DOI
10.1016/j.eiar.2018.05.001;
PII
S0195925517304195;

Publishing Information

Journal Title
Environmental Impact Assessment Review
Journal Volume
72
Journal Page Range
p. 12-24
ISSN
0195-9255
CODEN
EIARDK

INIS

Country of Publication
United States
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
50071151
Subject category
S20: FOSSIL-FUELED POWER PLANTS; S54: ENVIRONMENTAL SCIENCES;
Descriptors DEI
BANGLADESH; COAL; ENVIRONMENTAL IMPACT STATEMENTS; FOSSIL-FUEL POWER PLANTS
Descriptors DEC
ASIA; CARBONACEOUS MATERIALS; DEVELOPING COUNTRIES; DOCUMENT TYPES; ENERGY SOURCES; FOSSIL FUELS; FUELS; MATERIALS; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Copyright
Copyright (c) 2017 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.