Published May 31, 1995
| Version v1
Report
Open
Summary report of incineration plenum fire: Building 771, July 2, 1980
Description
At about 1100 on July 2, 1980, a temperature rise above normal was recorded on charts monitoring operation of the incinerator in Room 149, Building 771. The plenum overheat alarm sounded at 1215, emergency actions initiated, and the fire was extinguished and mop-up began at about 1300. Investigation determined that the fire in the plenum was caused by a heat rise in the system, a deteriorated bypass valve on the No. 3 heat exchanger (KOH scrubber), nitration of the urethane seal on the HEPA filter media to the filter frame, and accumulation of metallic fines on the filter media. It was concluded that the management system responded properly, except for the ring- down system to activate the Emergency Operations Center
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95014665; NTIS; US Govt. Printing Office Dep.Files
26077278.pdf
Files
(2.7 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:a495947236491a8245423d0ce2b846bd
|
2.7 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 41 p.
- Report number
- RFP--4969
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26077278
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- EMERGENCY PLANS; FIRES; INCINERATORS; ROCKY FLATS PLANT
- Descriptors DEC
- NATIONAL ORGANIZATIONS; US AEC; US DOE; US ERDA; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC34-90RF62349
- Funding organization
- USDOE, Washington, DC (United States).