Reactor safety considerations during major safety system retrofit on a fuelled Pickering Unit

Creators

  • 1. Ontario Hydro, Toronto, ON (Canada)

Description

Pickering Unit 4 underwent a five month outage, ending April 1989, during which major modifications were made to all the safety systems. Since the reactor remained fuelled during the outage, complex scheduling and innovative work methods were required to ensure that all reactor safety considerations were met. (author). 1 fig

Part of:
Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3

Additional details

Publishing Information

ISBN
0-919307-39-6; 0-919784-17-8
Imprint Title
Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3
Imprint Pagination
3 v. [1200 p.].
Journal Page Range
v. 3 p. 16.26-16.31.
ISSN
0706-1293; 0227-1907
Report number
INIS-mf--14668

Conference

Title
10. annual conference of the Canadian Nuclear Society.
Dates
4-7 Jun 1989.
Place
Ottawa, ON (Canada).

Optional Information