Published October 2014 | Version v1
Miscellaneous

Hot functional testing of the pressurized heavy water reactor plant Atucha II with light water

  • 1. AREVA GmbH, Erlangen (Germany)
  • 2. Nucleoelectrica Argentina S.A., Buenos Aires (Argentina)
  • 3. Comision Nacional de Energia Atomica, Buenos Aires (Argentina)

Description

The two pressurized heavy water reactors PHWR Atucha I (designed and built by S/KWU, now AREVA), and Atucha II (designed by S/KWU and plant construction now completed by NA-SA) are owned by Nucleoelectrica Argentina S.A. (NA-SA). Atucha II was designed in the 1980'ies in parallel to the two most recent S/KWU PWR generations Prekonvoi and Konvoi. Its basic design has been updated and optimized including also backfitting of components and systems for severe accident management. The gross electric power of the plant is 745 MWe. Construction and commissioning of Atucha II has been resumed by NA-SA after a work stop in the 1990'ies and is now almost completed. Hot functional testing HFT was performed in two phases in September and October 2013 and in March and April 2014. Hot functional testing was performed with light water and the fuel assemblies loaded. The chemistry program for the HFT was derived from practices and experience gathered at other S/KWU designed PWRs during HFTs and consisted of the following main targets and requirements: (1) Low chloride and sulfate concentrations close to normal operation values specified in the VGB water chemistry guideline for power operation of PWR plants; (2) Thorough oxygen removal during heat-up and reducing conditions through N2H4 dosing; (3) High pH value (target range 1.5 to 2 ppm Li); (4) Passivation treatment of the nuclear steam supply system NSSS at temperatures of at least 260°C for a time period of at least 120 hours; (5) Zinc addition at a constant rate of 20 g Zn per day throughout the various HFT phases. Zinc dosing was begun during the first heat-up of the plant at temperatures above approx. 150°C. Daily measurement of the zinc concentration for process control was not necessary and not required due to the elaborated zinc application procedure. The main results of the chemistry program for the HFT of plant are described and evaluated in this contribution. Data shows that all chemistry targets were met. The nuclear commissioning phase with heavy water was in progress when this paper was prepared. The first criticality was reached on 3rd June 2014. After successful completion of power range testing at 30%, reactor power was increased on 22nd July 2014 to 50% after approval of the Argentinian authority. (author)

Part of:
Proceedings of nuclear plant chemistry conference 2014 Sapporo (NPC 2014)

Additional details

Publishing Information

Imprint Title
Proceedings of nuclear plant chemistry conference 2014 Sapporo (NPC 2014)
Imprint Pagination
2471 p.
Journal Page Range
10 p.

Conference

Title
Nuclear plant chemistry conference 2014
Acronym
NPC 2014
Dates
26-31 Oct 2014
Place
Sapporo, Hokkaido (Japan)

Optional Information

Notes
Available as USB Flash Memory Data in PDF format, Folder Name: Poster2, Paper ID: 10087NPC2014proceedings.pdf; 8 refs., 3 figs., 1 tab.