Published November 1990 | Version v1
Report Open

Site characterization and validation - monitoring of head in the Stripa mine during 1989

  • 1. Swedish Geological Co., Uppsala (Sweden)
  • 2. ABEM AB, Stockholm (Sweden)
  • 3. Swedish Geological Co., Malaa (Sweden)

Description

The groundwater head has been monitored in some 50 borehole sections surrounding the site which is investigated as a part of the site characterization and validation project. This report contains basic data on the head monitoring system and graphical presentation of the results obtained during 1989. (au)

Availability note (English)

MF available from INIS under the Report Number.

Files

23010989.pdf

Files (2.2 MB)

Name Size Download all
md5:40d7d078e185f03c472c6915e904ce2a
2.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
204 p.
Report number
STRIPA-IR--91-02