Published 2018 | Version v1
Miscellaneous

Verification and remaining problems of the countermeasures against the electron cloud effect in the SuperKEKB positron ring

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

The electron cloud effect (ECE) was observed in the Phase-1 commissioning (February – June, 2016) of the SuperKEKB positron ring. The electron cloud was considered to be formed in the beam pipes at drift spaces, which have antechambers and TiN coating as the countermeasures against ECE. Before starting the Phase-2 commissioning (March – July, 2018), permanent magnets or solenoids, which make axial magnetic fields of several ten gausses, were attached along the beam pipes as additional countermeasures. The effect of the magnets was verified in the Phase-2 commissioning. At the same time, the maximum secondary electron yield (SEY) of the TiN coating and the photoelectron suppression effect of the antechambers were evaluated from the simulations and the experiments using beams during the Phase-2 commissioning. (author)

Part of:
Proceedings of the 15th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
SuperKEKB陽電子リングの電子雲不安定性対策の検証と課題

Publishing Information

Imprint Title
Proceedings of the 15th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1380 p.]
Journal Page Range
p. 659-663

Conference

Title
15. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2018
Dates
7-10 Aug 2018
Place
Nagaoka, Niigata (Japan)

Optional Information

Notes
9 refs., 11 figs. Imprint:#7B2C#15#56DE##65E5##672C##52A0##901F##5668##5B66##4F1A##5E74##4F1A#