Beam commissioning for neutron and muon facility at J-PARC

  • 1. J-PARC Center, Japan Atomic Energy Agency, Tokai, Ibaraki 319-1195 (Japan)
  • 2. J-PARC Center, KEK, Tsukuba, Ibaraki 305-0801 (Japan)

Description

At J-PARC, an intensive pulsed 3-GeV proton beam (1 MW and 25 Hz) extracted from a rapid cycling synchrotron (RCS) is introduced to a mercury target for a neutron source and to a carbon graphite target for a muon source. In order to obtain the beam characteristics before irradiating the targets, beam commissioning was carried out using a beam dump during the accelerator study. Along the beam line to the dump, several beam monitors were located for beam diagnostics. It was found that all the beam monitors functioned as expected.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.nima.2008.11.068

Additional details

Identifiers

DOI
10.1016/j.nima.2008.11.068;
PII
S0168-9002(08)01653-7;

Publishing Information

Journal Title
Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment
Journal Volume
600
Journal Issue
1
Journal Page Range
p. 41-43
ISSN
0168-9002
CODEN
NIMAER

Optional Information

Copyright
Copyright (c) 2008 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.