Published October 10, 1990
| Version v1
Journal article
Beam separation in an asymmetric energy collider using a tilted experimental solenoid
Description
The CERN-PSI feasibility study of a B-Meson Factory in the ISR tunnel has resulted in the proposal of a 3.5 on 8.0 GeV machine with a bunch spacing of 12 m, to be reduced eventually to 3 m. The beams will be vertically separated by the radial field component of the 1.5 T experimental solenoids, rotated for this purpose by 4 degrees, and by the fields acting on the off-centered beams in the central interaction region quadrupoles. Vertical separations of 6 σx are obtained at 3 m from IP, and of 2.5 σx at 1.5 m. The solenoid tilt and the amount of synchrotron radiation arriving in the central detector are compatible with the requirements of the experiments. The geometry and the performance of the proposed separation scheme are presented
Additional details
Publishing Information
- Journal Title
- AIP Conference Proceedings
- Journal Volume
- 214
- Journal Issue
- 1
- Series
- AIP Conf. Proc.
- Journal Page Range
- 309-313
- ISSN
- 0094-243X
- CODEN
- APCPC
Conference
- Title
- the standards model and beyond.
- Acronym
- 1990 Lake Louise winter institute
- Dates
- 18-24 Feb 1990.
- Place
- Lake Louise (Canada).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 22051732
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Numerical Data
- Descriptors DEI
- B MESONS; BEAM DYNAMICS; CERN ISR; COLLIDING BEAMS; ELECTRON-POSITRON INTERACTIONS; EXPERIMENTAL DATA; FEASIBILITY STUDIES; GEV RANGE 01-10; QUADRUPOLES; SPECIFICATIONS; STORAGE RINGS
- Descriptors DEC
- BEAMS; BEAUTY PARTICLES; BOSONS; DATA; DYNAMICS; ELEMENTARY PARTICLES; ENERGY RANGE; GEV RANGE; HADRONS; INFORMATION; INTERACTIONS; LEPTON-LEPTON INTERACTIONS; MECHANICS; MESONS; MULTIPOLES; NUMERICAL DATA; PARTICLE INTERACTIONS; PSEUDOSCALAR MESONS
Optional Information
- Secondary number(s)
- CONF-9002118--.