Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

Description

This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00798123; PURL: https://www.osti.gov/servlets/purl/798123-ZG0M4S/webviewable/

Files

34004076.pdf

Files (636.1 kB)

Name Size Download all
md5:eec3b7813b0dc770d28304e86ef652d4
636.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
20 p.
Report number
HNF--5178

Optional Information

Contract/Grant/Project number
AC06-96RL13200
Funding organization
ENVIRONMENTAL MANAGEMENT (United States)