Synchronization of a variable frequency source with a fixed frequency source using a sliding-mode controller
Creators
- 1. Superconducting Super Collider Lab., Dallas, TX (USA)
- 2. Texas Univ., Arlington, TX (USA)
Description
One way of synchronizing the SSC Low Energy Booster with the Medium Energy Booster is by matching the longitudinal phase of the designated RF buckets of two machines throughout acceleration to a pre-programmed trajectory. This makes the synchronization predictable in advance. The model associated with the phase-locking is time-varying and model parameters are subjected to disturbance due to errors in the bending magnetic field. Also the disturbance could be due to other feedback loops such as a B-field loop or a beam phase loop in the system. The measured phase error between the two reference waves may not be accurate. Hence in this paper we have shown the design of a Sliding-Mode controller for such an application. In the absence of measurement errors and parameters uncertainties and with no disturbance, the controller reduces to a classical gain feedback. Due to the general approach we have adopted in synthesizing the controller, the techniques can be applied to existing synchronization schemes. 2 refs., 4 figs
Availability note (English)
MF available from INIS under the Report Number; OSTI as DE91014892; NTIS; INIS; US Govt. Printing Office Dep.
Files
Additional details
Publishing Information
- Imprint Pagination
- 4 p.
- Report number
- SSCL--417
Conference
- Title
- 1991 Institute of Electrical and Electronics Engineers (IEEE) particle accelerator conference (PAC).
- Dates
- 6-9 May 1991.
- Place
- San Francisco, CA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 22084964
- Subject category
- S43: PARTICLE ACCELERATORS; S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM BUNCHING; CONTROL SYSTEMS; FEEDBACK; FREQUENCY CONTROL; PARTICLE BOOSTERS; PERFORMANCE; RF SYSTEMS; SUPERCONDUCTING SUPER COLLIDER; SYNCHRONIZATION
- Descriptors DEC
- ACCELERATORS; BEAM DYNAMICS; CONTROL; CYCLIC ACCELERATORS; DYNAMICS; MECHANICS; STORAGE RINGS; SYNCHROTRONS
Optional Information
- Contract/Grant/Project number
- Contract AC02-89ER40486
- Funding organization
- USDOE, Washington, DC (USA).
- Secondary number(s)
- CONF-910505--352.