Published July 1983 | Version v1
Journal article

Large test rigs verify Clinch River control rod reliability

  • 1. Westinghouse Electric Corp., Madison, PA (USA)

Description

The purpose of the Clinch River control test programme was to use multiple full-scale prototypic control rod systems for verifying the system's ability to perform reliably during simulated reactor power control and emergency shutdown operations. Two major facilities, the Shutdown Control Rod and Maintenance (Scram) facility and the Dynamic and Seismic Test (Dast) facility, were constructed. The test programme of each facility is described. (UK)

Additional details

Publishing Information

Journal Title
Nucl. Eng. Int.
Journal Volume
28
Journal Issue
343
Series
Nucl. Eng. Int.
Journal Page Range
38-40
ISSN
0029-5507