Published 2000 | Version v1
Miscellaneous

Preliminary estimation of additional nuclear back-end costs for Ignalina NPP

  • 1. Lithuanian Energy Institute, Kaunas (Lithuania)

Description

Additional nuclear back-end costs were estimated for two Ignalina NPP shutdown scenarios: unit 1 in 2005, unit 2 in 2010 (scenario 2 and unit 1 in 2005, unit 2 in 2027 (scenario 4). Rad waste management costs (including disposal of spent nuclear fuel) for scenario 4 would be about 4.2 billion Lt and for scenario 2 - about 2.2 billion Lt. In the case of scenario 2 Ignalina NPP would cover 27% of total decommissioning costs and in the case of scenario 4 - 37% of these costs. (author)

Part of:
Science and industry in Lithuania. Proceedings of conference

Additional details

Additional titles

Original title (Lithuanian)
Ignalinos AE branduolinio kuro ciklo baigiamosios fazes busimuju kashtu preliminarus ivertinimas

Publishing Information

Publisher
Technologija
Imprint Place
Kaunas (Lithuania)
Imprint Title
Science and industry in Lithuania. Proceedings of conference
Imprint Pagination
352 p.
Journal Page Range
p. 229-232
Report number
INIS-LT--019

Conference

Title
Conference on science and industry in Lithuania
Original Conference Title
Moksline konferencija: Lietuvos mokslas ir pramone
Dates
1-2 Feb 2000
Place
Kaunas (Lithuania)

Optional Information

Notes
2 figs. Imprint:Lietuvos mokslas ir pramone. Konferencijos praneshimu medzhiaga